Our Beginning
- This appears to be a great spot for God's …
- A lone sign stuck out in the boonies. This …
- The sign reads, Future Site of... Nazarene …
- The site survey team getting things …
- Surveying the site.
- More site surveying.
- This may be the architect and the survey …
- Here are the faithful arriving for the …
- This picture was taken just before the …
- Waiting for the event to start.
- Preparing for the ground breaking …
- This are the shovels that will be used for …
- Worshiping during the ground breaking …
- The ground breaking ceremony in progress.
- This may be Dr. Williamson speaking.
- There appears to be a good turnout with …
- This was the best picture we could find of …
- Construction company trailers arrive on …
- The first erected building on the site was …
- The deep cuts begin.
- Here they are grading the site which is …
- The very early stages of ground …
- A landscaper hard at work.
- This appears to be a picture of Leist's …
- This is likely another shot of the …
- This is likely Leist's foundations.
- Preparing the way for Williamson and …
- This appears to be the administration …
- Forms being placed for the basement …
- Timbers arrive on site that will be used …
- The load from this ready-mix truck will be …
- Here they are pouring the basement walls …
- Poured foundation walls start to take …
- The skeleton of the top of the …
- Scaffolding was used while the rock facing …
- Some walls and a roof on Leist.
- This is a picture of Leist from the about …
- This is the administration building's …
- Leist on the left and they are just …
- A shot of Leist, from the parking lot …
- Supports continuously hold the walls in …
- Leist with the first walls of Williamson …
- This is Leist while still being shingled …
- Here is Leist in the foreground with more …
- Here are Williamson and Fireside with …
- This is a great picture of the loading …
